Supply Date22 Jun 2021
Contract NumberSAFAL/P/MN ORE/07.29/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)Ultra Low (Below 32%)
Lot NumberDebansy Engineering Mn Ore LG
Deviance0
Inward Quantity32.7
Freight9.81
Loading Charges0
Offloading Charges0
Royalty3.16
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1764.82
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.25
Fe2.86
SiO217.35
Al2O32.85
P0.180
Size 0-10MM12.08
Size 10-20MM20.41
Size 20-100MM64.45
Size +100MM3.06
MOISTURE4.55