Supply Date27 Jun 2021
Contract NumberSAFAL/P/MN ORE/11.104/2020
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity28.24
Freight500
Loading Charges-130
Offloading Charges0
Royalty0
Other Cost22.428
Quality Deviance0
Grade Deviance0
Total Cost2508.75
Conversion Rate (Please insert 1 if no conversion is required)22.428
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn45.85
Fe3.11
SiO210.82
Al2O35.60
P0.150
Size 0-10MM4.02
Size 10-20MM3.72
Size 20-100MM74.11
Size +100MM18.15
MOISTURE1.29