Supply Date22 Jan 2020
Contract NumberSAFAL/P/MN ORE/01.04/2020
ItemManganese Ore
Supplier NameGeofrey Kunda
Grade (%)High (44% - 50%)
Lot NumberGeofrey Kunda- Mn Ore- MG
Deviance0
Inward Quantity17.07
Freight0
Loading Charges0
Offloading Charges0
Royalty0
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost1330.43
Conversion Rate (Please insert 1 if no conversion is required)14.485
Inward StatusAccepted

Raw Material Test

Showing 1-6 of 6 items.
Raw Material ComponentValue
SiO25.94
Fe16.55
Mn43.5
Size 0-10MM10-150mm
P0.14
Al2O31.92