Supply Date12 Jun 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity36.02
Freight17.83
Loading Charges0
Offloading Charges0
Royalty6.74
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost4162.83
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
SiO29.86
Fe2.08
Mn54.11
Size 20-100MM45.68
Size 10-20MM1.44
Size 0-10MM1.06
P0.105
Al2O32.55
Size +100MM51.82
MOISTURE0.86