Supply Date10 Jun 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity41.295
Freight8.92
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2185.33
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.26
Fe3.95
SiO214.16
Al2O36.86
P0.160
Size 0-10MM42.96
Size 10-20MM57.04
Size 20-100MM0
Size +100MM0
MOISTURE5.72