Supply Date10 Jun 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity46.295
Freight8.92
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2449.93
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.02
Fe4.11
SiO214.26
Al2O36.45
P0.165
Size 0-10MM44.65
Size 10-20MM55.35
Size 20-100MM0
Size +100MM0
MOISTURE6.10