Supply Date09 Jun 2021
Contract NumberSAFAL/P/MN ORE/11.104/2020
ItemManganese Ore
Supplier NameChisabi Bosco Kipelembe
Grade (%)High (44% - 50%)
Lot NumberChisabi Bosco- Mn Ore HG
Deviance0
Inward Quantity31.4
Freight500
Loading Charges-60
Offloading Charges0
Royalty82.086
Other Cost22.428
Quality Deviance0
Grade Deviance0
Total Cost3002.4
Conversion Rate (Please insert 1 if no conversion is required)22.428
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.88
Fe5.90
SiO213.18
Al2O35.75
P0.155
Size 0-10MM3.26
Size 10-20MM2.85
Size 20-100MM72.14
Size +100MM21.75
MOISTURE1.16