Supply Date05 Jun 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity38.515
Freight8.92
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2038.21
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.95
Fe3.85
SiO211.35
Al2O36.17
P0.190
Size 0-10MM5.28
Size 10-20MM49.72
Size 20-100MM0
Size +100MM0
MOISTURE6.28