Supply Date03 Jun 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity47.49
Freight8.92
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2513.17
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.12
Fe2.38
SiO210.86
Al2O34.96
P0.195
Size 0-10MM45.75
Size 10-20MM54.25
Size 20-100MM0
Size +100MM0
MOISTURE5.96