Supply Date01 Jun 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity39.56
Freight8.92
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2093.52
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.16
Fe4.28
SiO211.20
Al2O34.75
P0.195
Size 0-10MM42.80
Size 10-20MM57.20
Size 20-100MM0
Size +100MM0
MOISTURE5.98