Supply Date02 Jun 2021
Contract NumberSAFAL/P/MN ORE/05.20/2021
ItemManganese Ore
Supplier NameKATWAI MATHEWS
Grade (%)High (44% - 50%)
Lot NumberKatwai mn ore HG
Deviance0
Inward Quantity23.475
Freight15.605
Loading Charges0
Offloading Charges0
Royalty6.75
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2661.01
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn54.16
Fe1.90
SiO210.21
Al2O32.68
P0.095
Size 0-10MM0.95
Size 10-20MM1.35
Size 20-100MM87.26
Size +100MM10.44
MOISTURE0.87