Supply Date24 May 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity49.275
Freight8.96
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2609.6
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.83
Fe4.13
SiO210.94
Al2O34.95
P0.195
Size 0-10MM49.11
Size 10-20MM50.89
Size 20-100MM0
Size +100MM0
MOISTURE6.29