Supply Date21 May 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity32.745
Freight8.96
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1734.18
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.35
Fe3.97
SiO210.15
Al2O35.86
P0.180
Size 0-10MM15.10
Size 10-20MM22.68
Size 20-100MM62.22
Size +100MM0
MOISTURE5.10