Supply Date14 May 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity42.88
Freight8.96
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2270.92
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.61
Fe4.26
SiO210.36
Al2O35.16
P0.190
Size 0-10MM39.46
Size 10-20MM60.54
Size 20-100MM0
Size +100MM0
MOISTURE6.75