Supply Date05 May 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity42.095
Freight8.96
Loading Charges0
Offloading Charges0
Royalty0
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2229.35
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.95
Fe2.85
SiO29.96
Al2O35.46
P0.180
Size 0-10MM40.16
Size 10-20MM59.84
Size 20-100MM0
Size +100MM0
MOISTURE7.35