Supply Date21 Apr 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity31.755
Freight9.09
Loading Charges0
Offloading Charges0
Royalty4.62
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1832.58
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn42.80
Fe3.15
SiO29.15
Al2O34.88
P0.160
Size 0-10MM45.70
Size 10-20MM54.30
Size 20-100MM0
Size +100MM0
MOISTURE6.85