Supply Date17 Apr 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.79
Freight0
Loading Charges5
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2495.23
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.05
Fe3.11
SiO213.48
Al2O37.35
P0.175
Size 0-10MM9.46
Size 10-20MM3.85
Size 20-100MM50.91
Size +100MM35.78
MOISTURE2.56