Supply Date15 Apr 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity25.735
Freight8.18
Loading Charges-4
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1592.74
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.14
Fe3.15
SiO213.55
Al2O37.38
P0.17
Size 0-10MM6.79
Size 10-20MM4.36
Size 20-100MM39.20
Size +100MM49.65
MOISTURE2.38