Supply Date14 Apr 2021
Contract NumberSAFAL/P/MN ORE/04.13/2021- A
ItemManganese Ore
Supplier NameKampoko Resources Ltd
Grade (%)Medium (38% - 44%)
Lot NumberKampoko Mine- New Material
Deviance0
Inward Quantity35.775
Freight9.09
Loading Charges5
Offloading Charges0
Royalty4.62
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2064.58
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn43.08
Fe2.99
SiO29.15
Al2O34.77
P0.160
Size 0-10MM40.15
Size 10-20MM59.85
Size 20-100MM0
Size +100MM0
MOISTURE5.94