Supply Date14 Apr 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity27.105
Freight8.18
Loading Charges-4
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1677.53
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.10
Fe2.55
SiO213.18
Al2O36.77
P0.165
Size 0-10MM5.77
Size 10-20MM4.86
Size 20-100MM47.67
Size +100MM41.70
MOISTURE2.47