Supply Date12 Apr 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.695
Freight0
Loading Charges5
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2489.27
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.12
Fe3.16
SiO212.95
Al2O37.37
P0.165
Size 0-10MM5.78
Size 10-20MM3.04
Size 20-100MM38.14
Size +100MM53.04
MOISTURE2.44