Raw Material Inward
| Supply Date | 12 Apr 2021 |
|---|---|
| Contract Number | SAFAL/P/MN ORE/03.09/2021 |
| Item | Manganese Ore |
| Supplier Name | Debansy Engineering Ltd |
| Grade (%) | High (44% - 50%) |
| Lot Number | Debansy Engineering Mn Ore |
| Deviance | 0 |
| Inward Quantity | 39.695 |
| Freight | 0 |
| Loading Charges | 5 |
| Offloading Charges | 0 |
| Royalty | 3.71 |
| Other Cost | 1 |
| Quality Deviance | 0 |
| Grade Deviance | 0 |
| Total Cost | 2489.27 |
| Conversion Rate (Please insert 1 if no conversion is required) | 1 |
| Inward Status | Accepted |