Supply Date09 Apr 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity25.27
Freight8.18
Loading Charges-4
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1562.44
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.17
Fe2.68
SiO213.72
Al2O37.65
P0.165
Size 0-10MM9.183.77
Size 10-20MM56.27
Size 20-100MM30.78
Size +100MM0.165
MOISTURE