Supply Date08 Apr 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity25.91
Freight8.18
Loading Charges-4
Offloading Charges0
Royalty3.65
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1602.02
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.15
Fe3.16
SiO213.55
Al2O37.19
P0.17
Size 0-10MM8.70
Size 10-20MM5.16
Size 20-100MM51.78
Size +100MM34.36
MOISTURE1.95