Supply Date31 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.365
Freight0
Loading Charges5
Offloading Charges0
Royalty3.96
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2604.34
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
MOISTURE2.18
Size +100MM53.85
Size 20-100MM37.70
Size 10-20MM2.85
Size 0-10MM6.60
P0.175
Al2O37.02
SiO212.65
Fe3.15
Mn38.90