Supply Date30 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.305
Freight0
Loading Charges5
Offloading Charges0
Royalty3.96
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2600.56
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
MOISTURE2.45
Size +100MM51.29
Size 20-100MM40.19
Size 10-20MM2.82
Size 0-10MM5.70
P0.170
Al2O36.84
SiO212.26
Fe1.85
Mn39.16