Supply Date29 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity42.04
Freight0
Loading Charges5
Offloading Charges0
Royalty3.96
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2646.84
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn41.88
Fe1.64
SiO210.46
Al2O36.12
P0.16
Size 0-10MM4.38
Size 10-20MM2.7
Size 20-100MM15.67
Size +100MM77.24
MOISTURE1.89