Supply Date27 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.55
Freight0
Loading Charges5
Offloading Charges0
Royalty3.81
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2546.95
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.16
Fe3.10
SiO212.68
Al2O37.16
P0.175
Size 0-10MM6.46
Size 10-20MM3.77
Size 20-100MM38.90
Size +100MM50.87
MOISTURE2.28