Supply Date26 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity33.75
Freight0
Loading Charges5
Offloading Charges0
Royalty3.81
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2119.84
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.42
Fe2.64
SiO212.59
Al2O37.26
P0.17
Size 0-10MM5.21
Size 10-20MM5.84
Size 20-100MM40.72
Size +100MM48.23
MOISTURE2.33