Supply Date25 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.325
Freight0
Loading Charges5
Offloading Charges0
Royalty3.81
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2470
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.80
Fe1.88
SiO212.16
Al2O36.28
P0.17
Size 0-10MM6.15
Size 10-20MM5.82
Size 20-100MM37.83
Size +100MM50.20
MOISTURE2.39