Supply Date23 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity38.49
Freight0
Loading Charges5
Offloading Charges0
Royalty3.81
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2417.56
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn37.68
Fe3.24
SiO212.68
Al2O36.44
P0.170
Size 0-10MM8.49
Size 10-20MM3.94
Size 20-100MM38.70
Size +100MM48.87
MOISTURE2.66