Supply Date20 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.195
Freight0
Loading Charges5
Offloading Charges0
Royalty3.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2582.1
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.45
Fe2.42
SiO213.68
Al2O38.14
P0.17
Size 0-10MM5.12
Size 10-20MM6.10
Size 20-100MM32.34
Size +100MM56.44
MOISTURE2.74