Supply Date20 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity42.05
Freight0
Loading Charges5
Offloading Charges0
Royalty3.68
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2635.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.72
Fe2.68
SiO213.90
Al2O37.84
P0.17
Size 0-10MM6.19
Size 10-20MM4.84
Size 20-100MM38.68
Size +100MM50.29
MOISTURE2.29