Supply Date19 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity37.495
Freight0
Loading Charges5
Offloading Charges0
Royalty3.7
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2350.94
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.27
Fe2.94
SiO213.32
Al2O37.90
P0.17
Size 0-10MM4.86
Size 10-20MM5.74
Size 20-100MM49.22
Size +100MM40.18
MOISTURE2.55