Supply Date19 Mar 2021
Contract NumberSAFAL/P/MN ORE/03.09/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity38.405
Freight8.32
Loading Charges0
Offloading Charges0
Royalty3.59
Other Cost0
Quality Deviance0
Grade Deviance0
Total Cost2492.87
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.82
Fe3.19
SiO213.79
Al2O38.14
P0.17
Size 0-10MM6.49
Size 10-20MM5.77
Size 20-100MM34.88
Size +100MM52.86
MOISTURE2.29