Supply Date13 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.69
Freight0
Loading Charges5
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2551.67
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.36
Fe3.36
SiO213.74
Al2O37.46
P0.17
Size 0-10MM5.82
Size 10-20MM3.90
Size 20-100MM30.17
Size +100MM60.11
MOISTURE3.10