Supply Date13 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity38.98
Freight8.32
Loading Charges-4
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2417.93
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.56
Fe2.85
SiO213.55
Al2O37.59
P0.18
Size 0-10MM6.05
Size 10-20MM4.16
Size 20-100MM44.41
Size +100MM45.38
MOISTURE2.35