Supply Date12 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity37.84
Freight8.32
Loading Charges-4
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2347.22
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.10
Fe3.65
SiO212.66
Al2O37.39
P0.175
Size 0-10MM5.98
Size 10-20MM6.10
Size 20-100MM35.12
Size +100MM52.80
MOISTURE2.64