Supply Date12 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.44
Freight0
Loading Charges5
Offloading Charges0
Royalty3.71
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2473.28
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.56
Fe3.05
SiO213.80
Al2O37.18
P0.175
Size 0-10MM6.74
Size 10-20MM4.32
Size 20-100MM13.34
Size +100MM75.60
MOISTURE2.80