Supply Date10 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.81
Freight0
Loading Charges5
Offloading Charges0
Royalty3.69
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2495.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.11
Fe3.26
SiO213.77
Al2O37.97
P0.17
Size 0-10MM4.38
Size 10-20MM5.10
Size 20-100MM30.78
Size +100MM59.74
MOISTURE3.16