Supply Date07 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.17
Freight0
Loading Charges5
Offloading Charges0
Royalty3.78
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2521.87
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.10
Fe3.10
SiO213.10
Al2O37.64
P0.17
Size 0-10MM5.19
Size 10-20MM2.86
Size 20-100MM20.46
Size +100MM71.49
MOISTURE3.15