Supply Date06 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.42
Freight0
Loading Charges5
Offloading Charges0
Royalty3.77
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2599.93
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.30
Fe2.80
SiO213.26
Al2O37.55
P0.175
Size 0-10MM4.15
Size 10-20MM3.66
Size 20-100MM45.80
Size +100MM46.39
MOISTURE2.79