Supply Date05 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.535
Freight0
Loading Charges5
Offloading Charges0
Royalty3.77
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2732.69
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.15
Fe3.18
SiO213.26
Al2O37.49
P0.17
Size 0-10MM6.38
Size 10-20MM4.39
Size 20-100MM23.86
Size +100MM65.37
MOISTURE2.79