Supply Date04 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.355
Freight0
Loading Charges5
Offloading Charges0
Royalty3.62
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2589.65
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.35
Fe3.94
SiO213.65
Al2O37.19
P0.175
Size 0-10MM5.56
Size 10-20MM3.79
Size 20-100MM34.85
Size +100MM55.80
MOISTURE2.68