Supply Date03 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.945
Freight0
Loading Charges5
Offloading Charges0
Royalty3.73
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2756.67
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.47
Fe3.18
SiO212.55
Al2O37.22
P0.180
Size 0-10MM5.18
Size 10-20MM5.14
Size 20-100MM32.46
Size +100MM57.22
MOISTURE2.64