Supply Date02 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity43.885
Freight0
Loading Charges5
Offloading Charges0
Royalty3.73
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2752.91
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.54
Fe2.95
SiO213.55
Al2O37.74
P0.17
Size 0-10MM6.85
Size 10-20MM3.17
Size 20-100MM37.38
Size +100MM52.60
MOISTURE2.64