Supply Date02 Mar 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity42.7
Freight0
Loading Charges5
Offloading Charges0
Royalty3.73
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2678.57
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.16
Fe2.68
SiO212.15
Al2O37.66
P0.18
Size 0-10MM4.85
Size 10-20MM3.95
Size 20-100MM23.76
Size +100MM67.44
MOISTURE2.59