Supply Date26 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity39.355
Freight0
Loading Charges5
Offloading Charges0
Royalty3.76
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2469.92
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn38.94
Fe3.16
SiO212.46
Al2O37.38
P0.175
Size 0-10MM4.62
Size 10-20MM3.66
Size 20-100MM31.13
Size +100MM60.59
MOISTURE2.46