Supply Date23 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity40.53
Freight0
Loading Charges5
Offloading Charges0
Royalty3.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2547.31
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn40.10
Fe1.60
SiO211.50
Al2O35.10
P0.16
Size 0-10MM6.12
Size 10-20MM5.24
Size 20-100MM61.50
Size +100MM27.14
MOISTURE2.20