Supply Date23 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity26.12
Freight8.44
Loading Charges-4
Offloading Charges0
Royalty3.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost1627.01
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn36.70
Fe1.92
SiO213.20
Al2O35.60
P0.16
Size 0-10MM10.50
Size 10-20MM6.10
Size 20-100MM46.61
Size +100MM36.79
MOISTURE2.50