Supply Date22 Feb 2021
Contract NumberSAFAL/P/MN ORE/01.05/2021
ItemManganese Ore
Supplier NameDebansy Engineering Ltd
Grade (%)High (44% - 50%)
Lot NumberDebansy Engineering Mn Ore
Deviance0
Inward Quantity41.83
Freight0
Loading Charges5
Offloading Charges0
Royalty3.85
Other Cost1
Quality Deviance0
Grade Deviance0
Total Cost2629.02
Conversion Rate (Please insert 1 if no conversion is required)1
Inward StatusAccepted

Raw Material Test

Showing 1-10 of 10 items.
Raw Material ComponentValue
Mn39.88
Fe2.35
SiO212.74
Al2O37.19
P0.17
Size 0-10MM6.59
Size 10-20MM4.74
Size 20-100MM42.87
Size +100MM45.8
MOISTURE2.74